My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1908 60TH ST SE 2016-01-01 MF Import
>
Address Records
>
60TH ST SE
>
1908
>
1908 60TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 4:44:22 PM
Creation date
4/17/2017 4:44:15 PM
Metadata
Fields
Template:
Address Document
Street Name
60TH ST SE
Street Number
1908
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLIANCE �9COMPLIANCE CHECKUST <br /> REQUIRED <br /> INSPECTION IMPORTANT:Please supply Information In the shaded boxes and check the appropriate <br /> APP <br /> circles. Disregard topics that don't describe your building or equipment. DQl(QI place <br /> ./checks In the two left Columns. <br /> D °Q Glazing/skyllghts by type Soo the Washington glazing directory <br /> No. Manufacturer Frame material # I ayers Model# Area (F12) Uo value Tested? <br /> ( U—%S� Yes <br /> U. _ YeS <br /> U. Yes <br /> o u CU.—]-- Yes <br /> v t U. _ iYes <br /> a o U. <br /> �0 ie S e✓ U. <br /> nv <br /> U-4— <br /> U. Yes O <br /> U._ Yes O <br /> O :rG-nteste—dGiazing (Umw�NdofmihUva)ueokCIWWIIO.S.10(ti) <br /> SingleGlazing (Nomvoowl%orhoaodflmwoa�iwedwbung,s.6o1_rs) U._ YesQ <br /> ype: No: Area: X2 U._ Yes O <br /> ype: � 1Co: Area X2 U._ Yes 0 <br /> O O <br /> Typo: No: Area: U._ <br /> Type: No: Area: U._ <br /> TOTAL GLAZING AAEA (Add entire column) —► <br /> �7 0 Q Maximum Allowed glazing area(S.602.7.1) is derived by taking the the total glazing area <br /> of—_..:jj,j*—W.4.- Ft2 and dividing by the total conditioned floor area of _ �,a�!LPt * �Ft2. <br /> Multiply this number by 100. This value can't exceed the glazing percentage for your seted option: ' <br /> G : 106i6(Option 1) Q s 121/0(Option II) ; 21%(Options III,IV, V) <br /> d s 25016(Option VI) O s 305;(Option VII), <br /> D O (DDocumentation Insufficient, U•values shall be Justified by Mir,testing report. <br /> O r< Glazing air leakage(S. 502.4.3 (c)) measures shall bo met as follows <br /> fixed site built: stops with sealant. <br /> A�, ❑ operating site built:weatherstrtpped with closer <br /> YF 0 rs Concealed Insulation shall be placed: Xbohind showor/lub)� behind partition studs/corner <br /> I (] re Standard air leakage (S. 502.4.3) caulking is complete and installed in the following locations <br /> 1) between Solo plate/subfloors 4) partition stud penetrations <br /> 2) wiring/plumbing/dud register penetrations 5) light fixture/Ilue penetrations <br /> 3) rim joists/mud sills (heated lower floors) 6) around window and door f,--- <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.