|
COMPLIANCEIDENTIAL 1991 WSEC RES
<br /> COMPLIANCE
<br /> RECUIRED
<br /> INSPECTION IMPORTANT:Please supply Information In the shaded boxes and check the appropriate
<br /> APPROV
<br /> ED PP Y
<br /> circles. Disregard topics that don't describe your building or equipment.R.OStOI place
<br /> checks In the two left columns.
<br /> ❑ ❑ ©Exterfor slab Insulation, it not locatod on the interior, shall be R-10 (Table 6-2).
<br /> ❑ ❑ ©i Exterior slab Insulation, it present, shall approved for below grade use and protected above grade.
<br /> ❑ QWalls, Including rim joists, shall be insulatod without compression to (Table 6.2):
<br /> OR-15 bait (Options 1,11) OR-19 (Option III, IV,V,`VI,VII)
<br /> ❑ ❑ Qlnterlor below grade walls shall be insulated without compression to (Table 6.2):
<br /> OR-15 (Options I, II) OR-19 (Options III,IV,V,Vi,VII)
<br /> ❑ ❑ Qo Vaulted ceilings shall be Insulated without compression to R-30(Table 6-2,A11 options)
<br /> ❑ ❑ ED :skylight wall Insulation is installed and equivalent to the required wall R-values above.
<br /> ❑ 0 Vapor retarders shall be installed toward the warm surface as represented below
<br /> Select one option for floors, walls, and appropriate ceilings`
<br /> Floors: Plywood W/exter or glue .O Poly (: 4 Mil) ® Backed bails
<br /> Walls: , Poly plastic(i 4 Mill O Face-stopled, backed baits ( PVA paint
<br /> Ceilings: Not required where ventilation space averages>12" above inhialfon.
<br /> Face stapled backed balls O Poly plastic(. 4 rail) A}PVA paint
<br /> ❑ ❑ » Healing system officlonry and sizing requirements shall be met as represented bolow:
<br /> ❑ Elg Heal Pump efficiency shall be mot under file following compliance path(S.503..4):
<br /> O Split system, air source hoat pump:HSPF.t 6.8, COP>3:0
<br /> O Single package, air source heat pump:,HSPF a.;6,6, COP. >3.0
<br /> O Water source heat pump:COP. 3.8
<br /> O Ground source heat pump COPa 3.0 f
<br /> �] ❑ central force-alr furnace AFUE rating, as listed in ilia GAMA Directory,shall be:
<br /> ®? .78 (Options 1, II,IV, VI,VII) O; .68 (Option III)), 0>J74(Option V)
<br /> ❑ ❑ Ic Non-central,combustion heating systems shall have intermitent Ignition
<br /> ❑ Maximum heating system output (150%of design heat load)Js �?b sp BTU4ir. (S.503.22) ,
<br /> E-1s Hlgh efficiency forced-air furnace (; 56,000 BTU/fir.output)may may exceed 150%of DHL
<br /> because: .OGAMA listed AFUE is, 78+ i per each 500D BTU/hr output that it exceeds the DHL.
<br /> WS -- —
<br /> WSEC insulation phase
<br /> r requirements:
<br /> Inspected by:
<br /> J ❑ i9 Envelope Floors shall be insulated without compression, and wlih supports 24"O.C.to:
<br /> &119(Options I, it, III, IV,V) ..0 R2(Options VI,VII)
<br /> tr t ❑ re Non-vbulted,attic ceilings shall be Insulated without compression to: Sco Table 6 2
<br /> /r OR-3o(options I, it. III, IV, V,Vu) d R38 (Option VI)
<br /> ( ❑ tr Door systems shal m U 40 (All options)
<br /> Door types are (1) ��t'_�i�s (t�j�✓°- hl� (�3evS
<br /> Page 5 of 6
<br />
|