Laserfiche WebLink
r r : <br /> PUBLIC WORKS PERMIT Date6/1112013Public Works Permit#: PW1306-013 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Building Permit#: C1306-001 <br /> l Zf� rJl/� Everett, WA 98201 <br /> (425) 257-8810 Planning Reference#: <br /> Public Works Fee$: $ 65.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> PINZARIU LIGIA PINZARIU LIGIA <br /> 1916 60TH ST SE 1916 60TH ST SE <br /> EVERETT WA 98203 EVERETT WA 98203 <br /> PHONE: 4254207000 PHONE: 4254207000 <br /> TAX PARCEL ID N 00495000203000 SITE ADDRESS: 1916 60TH ST SE <br /> DESCRIPTION OF PROPOSED WORK: <br /> LANDSCAPING& PAVING <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Landscaping required between street and patio with roof(Type 11 landscaping) <br /> 5. City standard driveway from 60th St SE must be paved. ] Cl-,q w <br /> rrrr--err.-- � Ixi L <br /> Your Public Works Inspector is G1 66+Fidw n Call him at 425.339-7404 for qu"igp!%gVerot <br /> FT, <br /> r`� c <br /> �; CQ <br /> r <br /> Y <br /> M N�P IA M Crl M1 <br /> TO POSTING <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned ownertapplicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages,costs,expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> or other right-of-way use hereto applied for and further agrees <br /> to remove same upon notice from the City and to replace <br /> Approv o 0 fru n Datepublic properly damaged thereby. <br /> z -/e_/ <br /> FINAL INSPEC ON Date 2� 7i rP <br /> Approved as Constructed Signature of Applicant Dr to <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION, <br />