Laserfiche WebLink
INSPECTION REPORT <br /> Date Z ( 1-1 I Pernnit:�-\s 10. OS <br /> Contractor; <br /> 2 �O <br /> Owner: <br /> Site Address:` -+ I `� Q ` <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> [I Temp Service r]LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conu,n El Foundation []Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units []Water Service <br /> ❑Gr ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑ ing Grid ElDrywall Nailing ❑Plumbing Final <br /> lectrical Final []Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Servico Hot Water Tank <br /> ms ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Floor drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> L] APPROVAL ❑ PART IAL APPROVAL FINAL APPROVAL TH <br /> ❑ OK FOR TCO. ❑ CORRECTION REQUESTED <br /> O ❑ VIOLATION <br /> l O PERFORM INSPECTION: _- <br /> �' �)757.8881 FOR REINSPECTION-74 hour notice required <br /> Inspector.,&z7,— / - -_ — Date: <br /> ein(lo%) / DAIABAR,INC <br />