My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2230 60TH ST SE 2016-01-01 MF Import
>
Address Records
>
60TH ST SE
>
2230
>
2230 60TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 5:15:28 PM
Creation date
4/17/2017 5:15:23 PM
Metadata
Fields
Template:
Address Document
Street Name
60TH ST SE
Street Number
2230
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MUDUM TO FHA C%JMIDWT FHA CASE N(, (• �:'(. y 13 - �c <br /> EET� �r OF / ADDRESS <br /> . <br /> .TE /a — 17—7�— r-► '_tLCST <br /> ecific=oomsitment conditions (applicable when checked) <br /> te-. All required repairs must be ccanpleted in a professional manner. <br /> All certifications and/or pest control certificates of completion must be submitted before <br /> requesting final inspection of repairs Note: If VC-15 la required, it is recommended <br /> this certificate be obtained before any other certifications are obtained and any repair <br /> work comienced. <br /> -11 If property is sold under Section 221(d)(2) a certificate of compliance with the <br /> minimum housing code will be required prior to requent for inspection of other addendum <br /> requirements. If there are no addendum requirements, the certificate may be submitted <br /> with closing documents. <br /> -12 Q Submit certification from the local authority having Jurisdiction that the subject <br /> property is in compliance with the Local Minimum Housing Code. <br /> -13 0 Submit certification from a state licensed pest control operator that wood destroying <br /> organisms, fungus and/or rot damage in all of the dwelling, interior and exterior, have <br /> been eliminated. Attach list of any repairs or corrections completed in connection <br /> with above certification. A "Standerd Notice of Woz•k Completed" or a report form <br /> indicating no infestation may be submitted as certification. Note: All repairs must <br /> be completed in a professional manner and in compliance with local building,, codes. <br /> -14 0 0 (a) This commitment is subject to receipt of clear certificate(s) for (electrical, <br /> plumbing, roofing, and heating). The required certificate(s) 1s (are) being ordered <br /> and-will be paid for by HUD. Cost of additional certificates or required repairs shall <br /> be borne by the Seller. <br /> 0 (b) Reinspection to examine the following systems) not In operation at the time <br /> of our appraisal is required. Please notify this office in writing when ready for <br /> inspection: Q <br /> plumbing 0 heating electrical <br /> Correction of any deficiencies found is a specific condition of this commitment. <br /> Indicated system(s) shall be operable and inspection completed prior to the request <br /> for conversion to a firm co=itment. <br /> -15 Q Furnish evidence from the local health authority indicating approval of the <br /> Q individual water supply system, Q individual sewage disposal system. <br /> It is recommended the above evidence of approval be oLtaiaed before ccm�any <br /> other required repair work. <br /> -16 O Q (a) Re-roof Q dwelling and/or Q garage with minimum 2351/ self :;caling composition <br /> shingles or #1 cedar shingles, and repair sheathing sad install new flashinfp as necessar; <br /> Remove all old roofing when two or more layers exist. <br /> 8 (b) Repair roof of L7 dwelling and/or L/ gara4;e to an acceptable condition. <br /> (c) Re-roof built-up roof: After removinc all old roofing, install min. 3 ply-hot <br /> mo ed 15# felt roof with flood coat and 40011 gravel per 100 sq. ft. <br /> 2(d) Repair built-up roof: Remove all gravel and counter flashing from roof, clean <br /> surface to accept hot mop. Provide minimum 15 lb. felt, hot mopped and flood coated. <br /> Replace gravel and flashing and properly seal all gutters and apertures. <br /> -17L7 Paint all exterior metal and good trim of D house and/or hara�e after adequately <br /> preparing surface. In rooms with openable windows, at least one must be free and operabl, <br /> -18 0 Paint entire exterior of O house and/or Q garage including trim. ITepare surface <br /> by repairing all damaged and deteriorated areas, remove all loose paint and blisters and <br /> apply an undercoat to all bare wood. In rooms with opennl,le windows, at least one must <br /> be free and operable. <br /> -19 Q Remove the existing floor covering in the following rooms: _ <br /> Replace with new resilient floor covering over suitable underlayment after making <br /> necessary repairs to subfloor. <br /> -20 4 Submit •statement from purchaser acknowledging wall-to-wall carpet as the finished floor <br /> in the / kitchen 47 bathroom. <br /> '�1' yGep ju8w:,01on90 Alit11ww03 <br /> A � q0 ,I LIQ <br /> TUMBLE <br /> A Form 1019-R-113 (Rev. 8-1-75) 591161 r Z NVr�7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.