Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> (8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof -lownspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length — <br /> 10. A catch basin as oar City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the 1 irking area. <br /> 11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 12. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 13. Pave driveway from the front property line out to the street paving. <br /> 14. Contact the Water District for connecting provisions fur this _uilding's <br /> water and sewer services. <br /> 15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 16. The contractor must meet with the Put: .: Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 17. A sprinkler systcrn is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> 18. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> PWCommenq ��� <br />