Laserfiche WebLink
eve1ett INSPECTION REPORT <br /> Address 1.�7 <br /> Contractor � G�� <br /> i <br /> Owner n„y, L.11�-•+161'11'�cc,�_ <br /> Date <br /> TYPE OF INSPECTION REQUESTED <br /> ❑ BLDG: Pmt. No. ❑MECH: PmL No. -230-'4a <br /> i <br /> ❑ELEC: Pmt. No. ❑ PLBG: Pmt.No. <br /> ❑Temp.Elect. ❑Framing Gas Piping <br /> ❑Footing ❑Drywall,Nailing Consultatlon <br /> ❑Foundation ❑Shear Nailing ❑Groundwork <br /> ❑Ductwork ❑Grid ❑Struct.Slab <br /> ❑Wood Stove ❑Rough-In ❑Final <br /> M sonry ❑Service ❑PPR _ <br /> AOVAL ) ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED <br /> ❑Corrections listed below MUST BE MADE before work can be approved. <br /> ❑Please contact Inspector and arrange for appointment. <br /> ❑Was not able to perform inspection. <br /> ❑CALL 259.8810 FOR REINSPECTION—24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> C <br /> Inspeclo Date <br />