Laserfiche WebLink
a <br /> everett INSPECTION REPORT <br /> eAddress <br /> Contractor <br /> Owner <br /> Date <br /> ITYPE OF INSPECTION REQUESTED <br /> ❑ BLDG: Pmt. No. ❑ MECH: Pmt. No. <br /> ELEC: Pmt. No. .p4LBG: Pmt. No. T_ <br /> ❑Temp. Elect. ❑ Masonry ❑Consultation <br /> ❑ Footing ❑Framinggroundwork <br /> ❑ Foundation ❑Drywall, Nailing ❑Struct. Slab <br /> ❑ Ductwork O Rough-In ❑ Final <br /> ❑Wood Stove ❑Service ❑ <br /> _ ❑Gas Piping <br /> ❑ APPROVAL PARTIAL APPROVAL <br /> El VIOLATION CORRECTION REQUIRED <br /> f7 Corrections listed below MUST BE MADE before work can be approved. <br /> 11 Please contact Inspector and arrange for appointment. <br /> Was not able to perform Inspection. <br /> ❑CALL 299114FtFg FOR REINSPECTION--24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> zs� -88Ip <br /> PQ-,; ep <br /> CP wE <br /> Inspector ' �— �� Date <br /> i <br /> 4 1 <br />