Laserfiche WebLink
i <br /> everett INSPECTION REPORT <br /> e _C^ <br /> Address �� 1 ,��.Jt._ <br /> C <br /> Contractor _ <br /> Owner <br /> Date <br /> TYPE OF ION REQUESTED <br /> X-ELL19557 DG: Pmt. No. rl MECH: Pmt. No. <br /> r7 ELEC: Pmt. No, 1-1 PLBG: Pmt.No. <br /> ❑Temp.Elect, ❑Fr In <br /> ❑Gas Piping <br /> ❑Footing ❑Drywall,Nailing ❑Consultation <br /> 5,154ndation ❑Shear Nailing ;Tyork <br /> Ductwo ❑Grid ❑StrucL S b <br /> cod Ste ❑Rough-in jQ„Final <br /> 13 Masonry ❑Service <br /> 6�APPROfJAL ❑ PARTIAL APPROVAL <br /> i VIOL ION ❑ CORRECTION REQUIRED <br /> orrectlons listed below MUST BE MADE before work can be approved. <br /> ❑Please contact Inspector and arrange for appointment. <br /> ❑Was not able to perform inspection. <br /> ❑CALL 259.5810 FOR REINSPECTION—24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE.PREMISES PRIOR TO OCCUPANCY. <br /> Inspector Date 21z, <br />