Laserfiche WebLink
,-� INSPECTION REPORT � <br /> Address SO� <br /> Contractor <br /> Owner <br /> f"-^- Date <br /> U APPROVAL U PARTIAL APPROVAL <br /> U VIOLATION U CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE before work can be approved. <br /> Qy+KIse contact inspector and arrange for appointment. <br /> jfpW as not able to perform inspection. <br /> ioru 259.8810 FOR REINSPECTION-24 hour notice required <br /> CERTIFICATE ISSUED AND POSTED <br /> PREMISES PRIOR TO OCCUPANCY. <br /> ON THEP <br /> _Date <br /> Inspect <br /> T PE OF INSPECTION REQUESTED <br /> J Framing U Gas Piping <br /> U Temp.Elect. J Drywall, Nailing U Consultation <br /> J Footing J Shear Nailing U Groundwork <br /> J Foundark J Grid U Struct. Slab <br /> J Ductwork U u in U Final <br /> J Wood Stove „�r icB U Insulation <br /> J Masonry �j COt`her <br /> U BLDG:Pmt. No. U MECH:Pmt.No. <br /> XELEC:Pmt.No.-67 . U FLOG:Pmt.No. <br />