Laserfiche WebLink
C <br /> ATS}DMMURAL ,At <br /> IE3Cja CI`x15 ,?OblTVQF(INNS ION ( <br /> vD <br /> 9MIIanrrr P�rn)i EVE <br /> roirn:rz)i r sem1C rT <br /> 1.%V,XYJI%V%(mir, <br /> Response to the review questions below original question in red. <br /> 1)Show cross section of ENTIRE "awning addition" 'Including footings. Show depth of footings and depth <br /> below grade. <br /> I have added a larger section of the new awning area, please see new section. <br /> 2) Provide gravity calculations for header(s)supporting new roof load in existing house. <br /> I have Included (5) talc sheets of each beam that is affected by the addition of the new awning, please <br /> see attached. <br /> 3)All post/beam and post/footing connections shall be capable of resisting uplift and lateral <br /> displacement. <br /> Each post has a Simpson ABU at the base and an AC at each post/ beam connection, each rafter is then <br /> tied to the beam with a Hl. Please see new Foundation and Roof plan on sheet 1. <br /> 4)Skylights shown on plans appear to be smaller than what is installed on the roof in the field; please <br /> correct. Specify curb height on skylights. <br /> The skylights have been revised and now reflect the corrected on the plan, please see sheet 1. <br />