My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
515 60TH ST SE 2016-01-01 MF Import
>
Address Records
>
60TH ST SE
>
515
>
515 60TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 6:40:14 PM
Creation date
4/17/2017 6:40:06 PM
Metadata
Fields
Template:
Address Document
Street Name
60TH ST SE
Street Number
515
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0APURL/C WORKS <br /> November 16, 2010 <br /> Chris Grounds <br /> 515 60" St SE <br /> Everett WA 98203 <br /> Subject: Project: Grounds <br /> Job Address: 515 60" St SE <br /> Plan Check No: WB1010-006 <br /> Dear Mr. Grounds: <br /> In response to your application for a construction permit, your plans have been examined and <br /> you are advised that the issuance of a permit is being withheld for the reasons listed below. <br /> These comments address building Issues only. Additional revisions or additions may be <br /> required by other departments (such as Utilities, Planning or Fire). All references refer to the <br /> (2009 International Building Code,) (2009 International Residential Code,) as amended by the <br /> State of Washington and/or Washington State Energy Code 2006 Edition, and adopted by the <br /> City of Everett, unless stated otherwise. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two new complete sets of drawings reflecting the <br /> corrections requested. <br /> 1. The "new awning section" provided is actually an elevation drawing. Provide a <br /> section that clearly illustrates how the structure is constructed and meets minimum <br /> code requirements, including section at laundry room <br /> 2. The "new awning roof plan" shows the 2x6 rafters ending at the exterior wall of the <br /> laundry room. The "new awning section" and "new awning elevation" show the <br /> rafters continuing up to the existing roof; please clarify. <br /> 3. The "new awning foundation plan" show (2) 10" x 10" x 6" pads supporting 6x6 <br /> posts. Footings are required to be on undisturbed soil not less than 12" below the <br /> finished grade. <br /> 4. The ABU-66 post base specified relies on anchorage to the foundation for design <br /> loads. Specify connection of ABU-66 to the concrete footing. <br /> 5. The 'roof eave detail" does not appear to apply to this structure; provide detail <br /> specific to this application. <br /> 6. Show beam of bearing wall between the laundry room and the house supporting 2x6 <br /> rafters. <br /> k10111.0 JMW%111010-006�(515 6e 51 SEI N <br /> chir-mIFFoI"ir /of IGI Ir rr:m/i FC nl\/ICInm . a7nn rwinr a�I•Fvr+ra8 WA AR701 -14751 2h7-8800•Faxt4251257-88.96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.