My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
611 60TH ST SE 2016-01-01 MF Import
>
Address Records
>
60TH ST SE
>
611
>
611 60TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 8:43:39 AM
Creation date
4/17/2017 6:46:25 PM
Metadata
Fields
Template:
Address Document
Street Name
60TH ST SE
Street Number
611
Notes
HOUSE DEMOLISHED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side fewer per City Standard #601. <br /> 06. <br /> Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5''1 wide, 2' deep and 25' long. See <br /> I <br /> atachment for more details. As. co tiC}c�nn}r VC G 7 /55/rl-4'me tlbnn ecbek9 -to <br /> {hr S�c•rn �i ,nor;c .S�Sfc/ m eGs� U/�•iv2 in 4CeotvtC ' Vir c Cr?ycl? /X73/07. <br /> The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13. Remove erosion control meast.-es upon completion of the project prior to final approval of the <br /> permit. <br /> C" <br /> 4;4. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> 8 C" <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove andreplace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> 8 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type ! concrete driveway per City of Everett Standard #307. <br /> Five driveway from the front property line out to the street paving. <br /> 18. Contact the_ Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A cp.;h basin der City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> PWC=rmnb <br /> 21Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.