My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
614 60TH ST SE 2016-01-01 MF Import
>
Address Records
>
60TH ST SE
>
614
>
614 60TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 6:53:53 PM
Creation date
4/17/2017 6:53:46 PM
Metadata
Fields
Template:
Address Document
Street Name
60TH ST SE
Street Number
614
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q 6- <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> 06. Connect side sewer per City Standard #'s 601, 602, 604. l� R Q <br /> v ii2 c'O 7-0 4FZ*X7 <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9 Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3.2.6.2. Width Depth Length _. <br /> 10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'; 305A <br /> & 306 on this proposal's frontage as directed by the Public Wo6s Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> i <br /> 1 Install a Type I concrete driveway per City of Everett Standard #307. <br /> 13 Pave dr veway from the front property line out to the street paving. <br /> 14. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 15. If a sewer pump system is to be installed, the pressure lirn3 must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 16.'The contractor must meet with the Public Works Inspertor to discuss potential drainage <br /> routing prior to beginning the project. p L i i ? <br /> 17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> OI_p -YVA-MT?— 5EP-vlGE CX/� = - 1-44 VC LuA-FE R 1�r=-FT C fl-c5nK <br /> 1� C.oiup, 7-I � rJ <br /> U l-I t_ 17-y CµA. P--r :>uouJ in�yj6-OAU P UI L5-) tt.► C15 - Cle6ol <br /> FOR- s�� � Wn.TiEER `DEV, <br /> PWCamwls <br />
The URL can be used to link to this page
Your browser does not support the video tag.