Laserfiche WebLink
Page 2 <br /> Work Activity Work Order 04/19/2002 8:4: <br /> Work Order Number 20013040 <br /> EQUIPMENT:_ - -- --- -- --- <br /> ID DESCRIPTION Date Units Cost <br /> Sub Total <br /> MATERIAL: <br /> ID DESCRIPTION Date Units Cost <br /> ADAP36001247 ADAPTER 1 MIP X 1 IPS INSTA-TI 03/20/2002 1.00 $13.04 <br /> BOX000153947 BOX METER CONCRETE W/STEEL LID 03/20/2002 1.00 $90.78 <br /> CORP36002247 CORP STOP 1 CCT X 1 IPS INSTA- 03/20/2002 1.00 S27.95 <br /> ELL036144047 ELBOW 1 NPT 90 DEG STREET CAST 03/20/2002 1.00 $2.51 <br /> METE36089247 METER 1 NEPTUNE T-10(NO REMOT PY20/2002 1.00 $96.32 <br /> PIPE36060747 PIPE 1 POLY IPS 03/20/2002 45.00 $12.56 <br /> SADD42015547 SERVICE SADDLE 4 W/1 CC TAP FO 03/20/2002 1.00 $14.34 <br /> SETT36033547 SETTER COPPER 1 (HEIGHTI5)LEG 03/20/2002 1.00 $105.30 <br /> MISCELLANEOUS: Sub Total 362.60 <br /> ID DESCRIPTION Date Units Cost <br /> Sub Total $0.90 <br />