My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
614 60TH ST SE 2016-01-01 MF Import
>
Address Records
>
60TH ST SE
>
614
>
614 60TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 6:53:53 PM
Creation date
4/17/2017 6:53:46 PM
Metadata
Fields
Template:
Address Document
Street Name
60TH ST SE
Street Number
614
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS Date 11'16'2001 <br /> PERMIT Public Works Permit PWO111-023 <br /> Building Permit a 00111-014 <br /> 4 PUBLIC WORKS DEPARTMENT Planning Reference a <br /> 32011 Cedar Street $25 . 00 <br /> E(425)257-8810WA 1 QUG 1 Z �QQ Public Works Foo S <br /> TO POSTING Guarantee$ <br /> APPICANT NAME <br /> AAND ADDRESS:PHINNEY CONSTRUCTION ANDLADDRESS, PHINNEY CONSTkUCTION <br /> PO BOX 976 PO BOX 976 <br /> EVERETT WA 98206 EVERETT WA 98206 <br /> PHONE ( 425)290-7573 PHONE: ( 425)290-7573 <br /> TAX PARCELIM 4 005793001003 PROJECT ADDRESS: 614 60TH ST SE #A&B <br /> DESCRIPT ON OF <br /> PROPOSED WORK: NEW HOUSE — BASIC 2181 <br /> PW <br /> LOT 3 & 4 SNO LAND C0 IST PLAT <br /> PERMIT CONDITIONS PORT GARDNER <br /> 1. All calls for inspection shat be made 24 hours in advance- phone(425)257-8810 <br /> 2. All work shall be performed in accordance with this permit and current City of Evrrett Design and Construction <br /> Standards and Specifications. <br /> 3. Call Location Underground Service 48 hrs.before you dig. TOLL FREE NUMBER 1-000.424.5555 <br /> 4 . Connect side sewer per City Standard # ' s 601, 602, 604 — 6" requited W <br /> to building. �- <br /> 5. Install a Type I concrete driveway per City Standard #307 . <br /> 6. Pave driveway from the front property line out to the street paving <br /> 7. The contractor must meet with the Public Works Inspector to discuss III <br /> drainage routing ( splash blocks? ) prior to beginning the <br /> project. 0 <br /> ., <br /> 12-12-01 9:17AM Z <br /> N 176147 <br /> OTHER 1800.00 0 <br /> If 111014 <br /> BUII-0 1475.35 <br /> SRCHG 6.50 <br /> DRIVE 25.00 <br /> f!ECH 120.00 a <br /> PLUMB 1.54.00 <br /> 0 112007 <br /> ";EW 70.00 <br /> UTILITY 1884.00 <br /> ACKNOWL OGEMENTCOFOCONDITIONS <br /> TOTAL 6734.85 <br /> The undersigned Omerlapplicant hereby ogr7e 19 I>p rd6734.95 <br /> -e; 7.0 save harmless the riy of Evordtt,l((Yn any and all claims for <br /> roved to COnstim Dns damages,costs.expenses,or,:a action that may ariso <br /> because al installation a maintenance of the improvement or <br /> nt right-of�way hereto ppkotl for and lunhar agrees to <br /> m ve same u n notice I the City and to replace public <br /> FINAL INSPECTION ,pro erty a there <br /> Approved as Constructed Date _ <br /> ign, re of App Oa'e <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN ISO DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br /> TO COMPLETION THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.