Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 0 Connect side sewer per City Standard#'s 601, 602,604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> Rooftop runoff must be discharged to a roof downspout Infiltration system per City of Everett Storm <br /> Maival 3-2.6.2. The approximate size trench is 3.5'wide,2'deep and 25'long. See attachment for <br /> mure details. <br /> The contractor must meet with the Pubh:Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works Inspector,such as sill fence, straw <br /> bales,swales,or erosion blankets. <br /> 11. Install erosion conbol measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior'.o final approval of the permit. <br /> 13. All excavated material from foundation,sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> No dirt,mud,rocks or debris to be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb,gutter and sidewalk as per City of Everett Standard Plan#'s 305A&306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e.all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard#307. <br /> 19 Pave driveway from the front property line out to the street paving. <br /> 20. Contact the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 with a gas trap per Standard Pian#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be Installed, the pressure line must discharge Into a private manhole,then <br /> gravity flow across the public right-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> Pwcommnb <br /> ���` <br />