Laserfiche WebLink
INSPECTION REPORT <br /> Date:9--j—/ Permit: AE <br /> / Contractor: <br /> Owner: Aloe 3 <br /> Site Address: �L� <br /> TYPE OF INSPECTION REQUESTED <br /> TRICAL BUILDING MECHANICAL PLUMBING <br /> Temp Service ❑LIFER ground ❑GroundworldSlab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Calling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to Insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑ eking Grid C]Drywall Nelling El Plumbing Final <br /> Electrical Final C-)ShearNailing GAS PIPE <br /> sl WORK ❑Roof Nailing ❑Rough INService Hot Wale Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rouglr In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HINT Final <br /> OTHER OR CONSULTATION: A <br /> cieAPPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> n'bK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C O, ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> (] CALL(/25)257.8881 FOR REINSPECTION-24 hour notice required <br /> Olc — No.�,✓ L��l�.k <br /> Inspector:_ Dale: <br /> � �jf`�Pww�• uauaUNt•�n/IIaaM <br />