My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
618 60TH ST SE 2016-01-01 MF Import
>
Address Records
>
60TH ST SE
>
618
>
618 60TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 6:58:01 PM
Creation date
4/17/2017 6:57:54 PM
Metadata
Fields
Template:
Address Document
Street Name
60TH ST SE
Street Number
618
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: PW10010 <br /> Public Works Permit#: PW1005-018 � <br /> City of Everett Public Works Department Building Permit#; C1005-014 <br /> 3200 Cedar Street <br /> Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 Public Works Fee$: $ 25.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> KLOES DEAN & KARLA TO POSTING (G Lq <br /> 7706 91ST AVE SE <br /> SNOHOMISH WA <br /> P40NE: <br /> PHONE: <br /> TAX PARCEL ID# 00579300100101 SITE ADDRESS: 618 60TH ST SE#AB <br /> DESCRIPTION OF PROPOSED WORK: <br /> NEW DUPLEX <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig TOLL FREE NUMBER 811 <br /> 4. Connect side sewer per Ciq,Standard#'s 601,602, 604. W <br /> 5. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm Manual H <br /> 3-2.6.2. The approximate size trench is 3.5'wide,2'deep and 25'long. See attachment for more details. „y <br /> 6. The contractor must meet with the Public Works Inspector(call Randy Allen at 426.339-7403)to discuss potential fj <br /> drainage routing prior to beginning the project. i ._ <br /> 7. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 8. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. 0 <br /> No wasting of material is allowed on this building lot. <br /> 9. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 10.Adjust water meter box 1"above sidewalk grade. S C <br /> 11. Pave driveway from the front property line out to the street paving. <br /> Pp Y c�Op yy�� M O <br /> �� Lrl�p�p} ,�s��p00'�41 <br /> ��06--]UOb .j <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs,expenses,or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> or other right-of-way use hereto applied for and further agrees <br /> to remov ame upon notice from the City and to replace <br /> App a or onstruc Oate pu PPERMIT <br /> p artydee thereby..rn T INAL INSPE TION Date <br /> Approved as Constructed f Appl gt Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS S ISSUED AND THERFAFrER 15 TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROIECr OVER 90 DAYS DURATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.