Laserfiche WebLink
i <br /> everett INSPECTION REPORT <br /> i„ -- <br /> Address S <br /> Contractor <br /> Owner <br /> Date �� <br /> TYPE OF INSPECTION REOUESTED <br /> ❑ BLDG: Pmt. No._ ❑ MECH: Pmt. No. j <br /> i <br /> ❑ ELEC: Pmt. No. _--- PLBG: Pmt. No. <br /> ❑Temp.Elect. ❑ Framing ❑Gas Piping <br /> ❑Footing ❑ Drywall,Nailing ❑Consultation <br /> ❑Foundation ❑Shear Nailing ❑Groundwork <br /> ❑ Ductwork ❑Grid ❑ truct.Slab <br /> ❑Wood Stove ❑ Rough-in nal <br /> O Masonry ❑Service ❑ <br /> APPROVAL ❑ PARTIAL APPROVAL <br /> VIOLATION ❑ CORRECTION REQUIRED <br /> ❑Corrections listed below MUST BE MADE before work can be approved. <br /> ❑ Please contact Inspector and arrange for appointment. <br /> ❑Was not able to perform inspection. <br /> ❑CALL 259.8810 FOR REINSPECTION—24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL E ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> IEC)I :l is <br /> Inspector Date <br />