Laserfiche WebLink
i <br /> everett INSPECTION REPORT <br /> eAddress 766 -6d'"SF Sal <br /> Contractor DoT M 611d --- <br /> Owner Owner <br /> Date 6-A_P? <br /> TYPE OF INSPECTION REQUESTED <br /> Cl BLDG: Pmt. No. _—AMECH: Pmt. No. 42/ <br /> ❑ELEC: Pmt. No. ❑ PLBG: Pmt.No. <br /> ❑Temp.Elect. ❑Framing O Gas Piping <br /> O Footing ❑Drywall,Nailing 0 Consultation <br /> O Foundation ❑Shear Nailing ❑Groundwork <br /> ❑Ductwork ❑Grid ❑Struct.Slab <br /> ❑Wood Stove ❑Rough-In XFlnal <br /> aso ❑Service O <br /> PPROVA ❑ PARTIAL APPROVAL <br /> ❑ CORRECTION REQUIRED <br /> I' D Corrections listed below MUST BE MADE before work can be approved. <br /> ❑Plense contact Inspector and arrange for appointment. <br /> O Was not able to perform Inspection. <br /> ❑CALL 259-88 10 FOR REINSPECTION—24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> ►l.v N <br /> Inspector —DateG <br /> / I <br /> I <br /> i <br />