Laserfiche WebLink
1 <br /> everett INSPECTION REPORT <br /> l / c <br /> Address �r7a n <br /> Contractor <br /> aiRl <br /> Owner /� m <br /> Date 3_l2_94 <br /> TYPE <br /> ��OF INSPECTION REQUESTED <br /> ,O tDG: PmL No.taLnQ2 ❑MECH: Pmt. No._ <br /> O ELEC: Pml. No. ❑ PLBG: Pml. No._ <br /> O Temp.Elect. ❑Framing O Gas Piping <br /> ❑Footing ❑Drywall,Nailing ❑Consultation <br /> J;oundallon ❑Shear Nailing U Groundwork <br /> uctwork O Grid ❑Struct.Slab <br /> ❑Wood Stove ❑Rough-In ❑Final <br /> O Masonry El C%AMra 0 <br /> ❑ APPROVAL 5 PARTIAL APPROVAL <br /> O VIOLATION El CORRECTION REQUIRED <br /> O Corrections listed below MUST BE MADE before work can be approved. <br /> ❑Please contact inspector and arrange for appointment. <br /> ❑Was not able to perform inspection. <br /> ❑CALL 269.8610 FOR REINSPECTION—24 hour notice required i <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PFVOR TO OCCUPANCY. <br /> ._ <br /> i <br /> i <br /> Inspector Date Z-7:,M <br />