Laserfiche WebLink
everett INSPECTION REPORT <br /> e <br /> Address �-ZR <br /> Contractor - <br /> Owner — <br /> Date ci' :1-RA <br /> TYPE OF INSPECTION REQUESTED <br /> IYBLDG: Pml. No. ,..P ? Zt-7 MECH: Pmt. No. <br /> ;1 ELEC: Pmt. No. fl PLBG: Pml. No. <br /> ❑Temp.Elect. ❑ Framing ❑Gas Piping <br /> ggFooting 0.P_ ❑ Drywall,Nailing ❑Consultation <br /> f�Foundation ❑ Shear Nailing Cl Groundwork <br /> ❑ Ductwork ❑Grid ❑Struct.Slab <br /> ❑Wood Stove ❑ Rough-In ❑Final <br /> ❑Masonry ❑ Service ❑ <br /> PPROVAL As ,nw�03> ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED <br /> ❑Corrections listed below MUST BE MADE before work can be approved. <br /> ❑ Please contact inspector and arrange for appointment. <br /> ❑Was not able to perform inspection. <br /> ❑CALL 259.8810 FOR REINSPECTION—24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> lie <br /> — I <br /> it <br /> Inspector �� Date 7-86 <br />