My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2509 61ST ST SE 2016-01-01 MF Import
>
Address Records
>
61ST ST SE
>
2509
>
2509 61ST ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 8:30:17 PM
Creation date
4/17/2017 8:30:14 PM
Metadata
Fields
Template:
Address Document
Street Name
61ST ST SE
Street Number
2509
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br /> Date:_ [ 4 _ Permit: F-J (301 -035 <br /> ContractorsK:f;� -01!071 c <br /> �C\•` \ <br /> Ownery��U��� <br /> Site A dress: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> Temp Service ❑UFER ground ❑Groundwork/Slab O Groundwork/Slab <br /> ❑Groundwork ❑Fooling I )Rough In []Rough In <br /> ❑SlablConduit (]Foundation (]Ceiling Grid []Ceding Grid <br /> Structural Slab (_)OK to insulate ❑OK to insulate <br /> Service ❑Framing [1 Rooftop Units i]Water Service <br /> _ ❑Insulation Lj Mechanical Final (__1 Medical Gas <br /> El GeW Drywall Nailing [ ]Plumbing Final <br /> leclrical'Final ❑Shear Nailing GAS PIPE <br /> WORK ❑Root Nailing ❑Rough InlServico Hot Water Tank <br /> Po <br /> L otmg drains E]Calling Grid []Refrigeration ]_1 Rough In <br /> Boor orcins ❑Building Final ❑Gas Pipe Final i.7 Hwr Final <br /> OTHER OR CONSULTATION. <br /> APPROVAL [] PARTIAL APPROVAL FINAL APPROVAL THIS P <br /> (-j OK FOR T C O. [ ] CORRECTION REQUESTED <br /> OK FOR C O ❑ VIOLATION <br /> (] UNABLE TO PERFORM INSPECTION. -- <br /> [] CALL(425)257.88RI FOR REINSPECTION-24 hour notice required <br /> Inspector: <br />
The URL can be used to link to this page
Your browser does not support the video tag.