My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
305 61ST ST SE 2016-01-01 MF Import
>
Address Records
>
61ST ST SE
>
305
>
305 61ST ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 8:34:19 PM
Creation date
4/17/2017 8:34:12 PM
Metadata
Fields
Template:
Address Document
Street Name
61ST ST SE
Street Number
305
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard#'s 601, 602,604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. I <br /> i <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manuel 3.2.6.2. The approximate size trench is 3.5'wide,2'deep and 25'long. See attachment for <br /> more details. <br /> /9. ) The contractor must meet with the Public Works Inspector to diswuss potential drainage routing prior to <br /> beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works Inspector, such as sill fence, straw <br /> bales,swales,or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> All excavated material from foundation,sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> 14. No dirt, mud,rocks or debrh to be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> G-:) <br /> 7. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A&306 on <br /> G- <br /> this proposal's frontage as directed by the Public Works Inspector(i.e.all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard#307. <br /> 19. Pave driveway from the front property line out to the street paving. <br /> 20. Contact the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be Installed, the pressure line must discharge trio a private manhole,then <br /> gravity flow across the public right-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> PWCORM% <br />
The URL can be used to link to this page
Your browser does not support the video tag.