Laserfiche WebLink
Work Activity Work Order <br /> 5/27/.1.008 4:30 <br /> Issued By CAG CRUM,GERRY <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 41312008 <br /> Fund 401 Accounts Program 710 Functior 219 Activity s64 <br /> Program <br /> Title 50.75 INCH 306 61ST ST SE 710119664 <br /> Work Order No 20080280 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Date 4/312008 Time 07:12 Original WO Billing <br /> Vehicle Costs <br /> Type Vehicle No Description Hours Cost Billing Date Billing Code Warehouse <br /> V J0046 1999 STERLING 5 YARD DUMP 5.5 935 04/22/2008 <br /> V M0043 2003 TIGER VACTOR 5.5 150.15 04/22/2008 <br /> V J0091 2008 FORD 1.5 TON SERVICE TRUC 5.5 59.4 04/22/2008 <br /> Total Vehicle Cost $303.05 <br /> Material Costs <br /> Type Mater No Description Quantity Cost Billing Date Billing Code Warehouse <br /> M ADAP34000547 ADAPTER 314 MIP X 3/4 IPS INSTA 1 11.685 04/22/2008 PAN <br /> M BOX000154347 BOX METER MOLDED PLASTIC WIDI L 1 61.196 04/2212008 PAN <br /> M CORP34001847 CORP STOP 314 CCT X 3/4 IPS INS 1 21.474 04/22/2008 PAN <br /> M ELL034104247 ELBOW 314 NPT 90 DEG STREET CAS 1 3.54 04122/2008 PAN <br /> M METE34141847 METER 518 X 314 NEPTUNE W/PRO R 1 227.699 04122/2008 PAN <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 10 2.64 04122/2008 PAN <br /> M SADD42015447 SERVICE SADDLE 4 W/314 CC TAP F 1 11.384 04/22/2008 PAN <br /> M SET734033647 SETTER COPPER 5/8 X 3/4(HEIGHT 1 8649 0422/2008 PAN <br /> Total Material Cost (E1 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date Billing Code Warehouse <br /> NA NIA METER NUMI3ER 83318070 1 0 04/22/2008 <br /> NA N/A SAND 1 23.2 04/22/2008 <br /> NA N/A TRACING WIRE 10 2 04/22/2008 <br /> Total NA Cost $25.20 <br /> Personnel Costs <br /> Type ID Name Hours Cost Billing Date Earning Code Class <br /> P DKR DAY,KEVIN R. 2.5 04122/2008 <br /> P DKR DAY, KEVIN R. 3 04/22/2008 <br /> P HLJ HUSBY,LANCE J. 5.5 0422/2008 <br /> P MJK MCKEEHAN,JACOB K. 5.5 04122/2008 <br /> P WDL WEAVER.DEAN L. 5.5 04122/2008 <br /> Total Personnel Cost $459.62 <br /> Total Cost $1,214.38 <br /> Nq) <br />