Laserfiche WebLink
Water Checklist X14 <br /> A. <br /> Date i/ .; Location 706 4 `V7-flE Crew Lead Q ��.fvPiF <br /> Flaggers Names Briefed? Briefed by <br /> (YES or NO) <br /> , <br /> Flagger Briefing: <br /> Job Tasks: Flagger Responsibilities, Emergency Signals, Flagger Radios, Specific work zone hazards, <br /> PPE, Night Lighting, Planned Equipment Movement, Emergency Escape Plans. <br /> C. Vehicle Inspection Checklist: <br /> Driver's Name Equipment N Location Inspection Comments <br /> Com leted? <br /> tjliy Tcro qif <br /> - - <br /> " D <br /> L. �s <br /> D. Checklist #4 - Routine Part 1 <br /> YES 0 YES NO <br /> 1. Make site visit before starting work 5. In water work ) <br /> 2. Define activity, scope, and limits • Stop work <br /> 3. Review Part 1 BMPs • Contact environmental staff for <br /> • Permit needed review <br /> • Equipment maintenance Evaluate using detailed checklist <br /> 1, 2, and/or 3 and routine <br /> • Disturbed soil checklist <br /> • Waste material removed <br /> • Spill kit 6. Location <br /> • Part 2 BMPs needed t <br /> • Use checklist N3 and routine 2 <br /> checklist 3 <br /> 4. Is environmental staff required? 4 <br /> NO - continue maintenance V 5 <br /> YES contact environmental staff for <br /> review <br /> ti:\aC•mmonkMSd\SfREFfS\anna.aoo7\�a4_Wneda �j/� <br />