My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
306 61ST ST SE 2016-01-01 MF Import
>
Address Records
>
61ST ST SE
>
306
>
306 61ST ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 8:42:41 PM
Creation date
4/17/2017 8:42:22 PM
Metadata
Fields
Template:
Address Document
Street Name
61ST ST SE
Street Number
306
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMME,4TS <br /> 4, Connect side sewer per City Standard#601. <br /> 0., Connect side sower per City Standard #'s 601,602,604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> (7, Connect rooftop downspouts M the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3.2.6.2. The approximate size trench is 3.5'wide,2'deep 1.,125'long. See attachment for <br /> more details. <br /> 9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, siraw <br /> bales, swales, or erosion blankets. <br /> 11; Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> C�' All excavated material from foundation, sidewalk and driveways shat!be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> 14 No dirt, mud, ro.ks or debris to be tracked onto roadway. <br /> {5, No building materials w 113 stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> 17,E Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A 8 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard#307. <br /> 19 Pave driveway from the front property line out to the street paving. <br /> 20. Contact the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> gat basirt�,perGily-Stendard-Plan1W02_w4haVas4rep-per-St;u dard-Wen-#419lcrequired for the <br /> ` perking area. <br /> 22. If a sewer pump system is to be Installed, the pressure line must&scharge into a private manhole, then <br /> gravity Bow across the public right-of-way. <br /> 23. A sprinkler system Is required for this building in compliance with the requirements of NFDA Standards <br /> 13D, l <br /> I'WCamenb �1 � Z. <br />
The URL can be used to link to this page
Your browser does not support the video tag.