Laserfiche WebLink
Date-L/,2# re <br />0* <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />City <br />Describe Proposed Work <br />Project Address lit knm, n) <br />I <br />Publrt WOA: Permll <br />oms DePI : <br />Public Work: Fee -- <br />Tpl:l Fee i <br />les: AVpt For Paid $ <br />Bel:nce Due $ <br />Attach four (4) copies of plans for proposed work - Draw to scr.lc al.d note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />Proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />Phone <br />Phone <br />PERMIT CONDITIONS <br />1. All calla for inspection shall be made 24 hrs. In advance - phone 259.8815. <br />2. All work shell be performed In accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications <br />3. Cell Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 1-800-424.5565 <br />Approved for Construction <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />�F <br />Im <br />O <br />Z <br />O <br />O <br />a <br />The undersigned owner applicant hereby agrees to hold and save harm• <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of Installation <br />and maintenance of the improvement or other right-ot• way use hereto <br />Date applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />FINAL INSPECTION Dale <br />Approved as Constructed <br />r, PrOt PUBLIC WORKS DEPARTMENT <br />Everett, WA 98201 <br />ve.lPhone: 259.8815 <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />