Laserfiche WebLink
everett INSPECTION REPORT <br />e <br />Address S3� <br />Contractor __] XlzesT 4F1eG% _ <br />Owner A-77-/ <br />Date G - 2 9 —4 O <br />TYPE OF INSPECTION REQUESTED <br />L! BLDG: Pml. No. ❑ MECH: Pml. No. _ <br />4RCEC: Pml. No. 7 i PLBG: Pmt. No <br />❑ Temp. Elect. <br />❑ Framing <br />❑ Gas Piping <br />O Footing <br />❑ Drywall, Nailing <br />❑ Consultation <br />❑ Foundation <br />❑ Shear Nailing <br />❑ Groundwork <br />O Ductwork <br />❑ Grid <br />❑ Struct. Slab <br />❑ Wood Stove <br />❑ Rough —in <br />I <br />❑ Masonry <br />Ice <br />WAPPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact Inspector and arrange for appointment. <br />❑ Was not able to perform Inspection. <br />❑ CALL 259.8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector L �U <br />---!'—�---------.—_ Date <br />