Laserfiche WebLink
PUBLIC W`jRKS <br />PERMIT <br />OOLPUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA98201 APR 0 4 <br />(425) 257-89I - P Q ST I N G <br />Dale 6/18/2001 <br />Public Works Permit A PWO106-023 <br />Building Permit C0106-020 <br />Planning Reference N <br />/ubllc Works Fee b <br />Guarantee E <br />OWNEII NAME WEIR BRENT A APPLICANT NAME <br />AND ADDRESS: AND ADDRESS. WEIR BRENT A <br />1702 62ND ST SE 1702 62ND ST SE <br />EVERETT WA 98:03 EVERETT WA 98203 <br />PHONE'. (425)754-3263 PHONE. <br />(425)754-3263 <br />TAX PARCEL I 0 52710000110008 PnOJECTADDRESS: 1704 62ND ST SE <br />UESCRiPTIONOF NEW HOUSE - BASIC 2120 <br />PROPOSED WORK. <br />PW <br />PERMIT CONDITIONS <br />1202- <br />$25.00 <br />ME <br />1. All calls for inspection shall be made 24 hours in advance - phone (425) 257-8810 <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1.800.42 55® -` <br />Uj <br />5. CONNECT BUILDING TO SIDE SEWER PER EVERETT STANDARDS I,G021 ( = <br />6. KEEP STREET CLEAN AT ALL TIMES. 'A <br />7. Ih5{7.1I eIh roo—F-% r na#" pew Skd 3-2.4,3 VI <br />TAVIG 3-7-2 aHd 9 9-2.2 (A+�--At11ei) l.. Z.3r%N 2, L Z "ice O <br />1:40V' [K. ei <br />Z <br />O <br />F- <br />0 <br />a <br />_ Z6 DI <br />Approved for — Dale <br />�-U L <br />FINAL INSPECTION <br />Approved as Constructed Dale <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner .applicant hereby agrees to hold and <br />save harmless me City of Everett from any and all claims for <br />damages, costs, expenses, of Causes of action that may arise <br />because of installation and maintenance of the Improvement of <br />other right of -way use hereto applied for and further agrees to <br />remove same upon notice from the City and to replace public <br />property damag d themb <br />Synal eel leant Date <br />WORK AUT14ORIZED BY THIS PERMIT MUST BE STARTED WITHIN 190 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION <br />