My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2111 62ND ST SE 2016-01-01 MF Import
>
Address Records
>
62ND ST SE
>
2111
>
2111 62ND ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 3:37:30 PM
Creation date
4/17/2017 9:16:30 PM
Metadata
Fields
Template:
Address Document
Street Name
62ND ST SE
Street Number
2111
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved pian d.ited <br />5. Connect side sewer per City Standard #601. <br />(6` Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Fooftop runoH must be discharged to a roof downspout infiltration systern per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. A catch basin as per City Standard Plan #402 with a gas trap per Staridard Plan #410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewalk as per City oi Evere;t Stanciard Pian #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard H<'1U7. <br />13. Pave driveway from the front property line out to the street paving. <br />14. Contact the _ Water District for connecting provisions for this building's <br />water and sewer services. <br />15. Ii a sewer pump system is to be installed, the pressure line rriust discharge into a private <br />manhole, then gravity flow across the public right-ot-way. <br />�6. The contractor must meet wlth the Public Works Inspector !o discuss potentiai drainage <br />rau�'ng prior to beginning the project. <br />17. A sprinkler system is required for lhis building in compliance with the requirements oi NFDA <br />Standards 13D. <br />18. All excavated material from foundation, sidewalk and driveways shell be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />PYlCamaer�s <br />
The URL can be used to link to this page
Your browser does not support the video tag.