Laserfiche WebLink
(""(,rptt INSPECTION REPORT <br />Address <br />Contractor <br />owner /�Y t►y n r �r <br />Owner u <br />Date I�^ <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. �—FJ MECH: Pmt. No. <br />p�% n PLBG: Pmt. No..�- <br />n ELEC: Pmt. No. <br />❑ Temp. Elect. <br />❑ Footing <br />❑ Foundation <br />❑ Ductwork <br />❑ Wood Stove <br />❑ Masonry <br />OLATION <br />❑ Framing <br />❑ Drywall, Nailing <br />❑ Shear Nalling <br />❑ Grid <br />❑ Rough•ln <br />gLService <br />❑ Gas Piping <br />❑ Consultation <br />❑ Groundwork <br />�Struct Slab <br />Final <br />O PARTIAL APPHUVHL <br />❑ CORRECTION REQUIRED <br />a vl <br />before work can be approved. <br />❑ Corrections listed below MUST BE MADE <br />❑ Please contact Inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 269.8810 FOR REINSPECTION — 24 hour notice required. <br />CERTIFICATE <br />F OCCUPANCY <br />OCCUPANCY.ALLBE ISSUED AND POSTED ON <br />THE <br />Dnte <br />Inspector <br />