My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2505 62ND ST SE 2018-01-02 MF Import
>
Address Records
>
62ND ST SE
>
2505
>
2505 62ND ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 3:35:49 PM
Creation date
4/17/2017 9:28:07 PM
Metadata
Fields
Template:
Address Document
Street Name
62ND ST SE
Street Number
2505
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br />COST ESTIMATE SHEET <br />" POSTING 'Ea 7 V61 <br />Receipt # <br />Cost of Work Order <br />X Cost of Service Order <br />Contact Person Siggi Ulrich <br />Requested By Paul McKee <br />Property Owner (name) Siggi Ullrich <br />Charge Cost to.(namc if different than owner) <br />DEC 2 8 19 D <br />94 <br />CITY OF EVERETT <br />Public Works Dept. <br />S <br />$2,484.0 <br />Address PO Box 2153 City <br />Installation Location 2505 - 62nd Street SE - Ever <br />Construction <br />Everett <br />Public Works Department;5 <br />Utilities Divisid <br />3200 Cedar Street <br />Everett, Washington 98201 -. <br />(206) 259-8800' <br />Date Paid 9 <br />Work Order # <br />Service Order # <br />Telephone # 290-6080 <br />Date of Request 12/23/94 <br />Zip 98203 <br />Installation typeldcscription/size/etc. Install 6 x 4 tapping tce & valve and final connect - 4" DDCA & 2" meter <br />not included in estimate -- <br />® The follo%%ing estimate is based upon the Utilities Division providing all labor, equipment, materials, restoration, <br />and final hook-up. <br />❑ The following estimate is based upon the Street Division work group providing all labor, equipment, materials <br />and restoration to property. <br />Whenever the estimated cost is not sufficient to cover the total expense. for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such Installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the installation., <br />Itemized Cost Estimate: <br />Labor & Benefits <br />Material <br />Equipment Rental <br />Surface Restoration <br />TOTAL <br />Prepared by: <br />Accepted by: <br />$1,290.00 <br />583.00 <br />494.00 <br />117.00 <br />S2,484.00 <br />cc: Bldg. Permit Counter <br />Clair Olivers <br />Tom Thetford <br />Don Weitkamp <br />Kirk Brooks t <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Crafty LN1W 0van,i <br />
The URL can be used to link to this page
Your browser does not support the video tag.