My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2505 62ND ST SE 2018-01-02 MF Import
>
Address Records
>
62ND ST SE
>
2505
>
2505 62ND ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 3:35:49 PM
Creation date
4/17/2017 9:28:07 PM
Metadata
Fields
Template:
Address Document
Street Name
62ND ST SE
Street Number
2505
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FPOM : DOVETAIL STPUCTUPES <br />PHONE NO. : 206 742 0861 <br />Jan. 30 1996 11:19AM <br />n <br />Hen Jackson <br />City of Everett <br />Building Inspector <br />DOVETAIL STRUCTURES <br />12821 - 49TIl Ur. S.L. <br />Everett, WA 98208 <br />(206) 742-0861 <br />SLbject: 62nd St. Condon <br />Doryan Construction <br />Pernit 045711 <br />January 30, 1996 <br />In accordance with a request of the contractor, Doryan <br />Construction, the purpose of this letter is to clarify the <br />shear wall schedule for the above project. Apparently there <br />is some confusion relating to the sheetrock shear walls. <br />Please note that the intention of "two layers" of sheetrock <br />is not to have two layers placed on each side of the wall, <br />which would require totally different nailing than specified <br />in the plans. Rather, the intention was to have one layer of <br />sheetrock applied to each side of the well. <br />If you have any rluestions, plenso call me at: 742-0861. Thank <br />you. <br />Michael P. McCann, SE <br />
The URL can be used to link to this page
Your browser does not support the video tag.