Laserfiche WebLink
INSPECTION REPORT <br />Address <br />Contractor <br />Ownerc <br />TYPE OF INSPECTION REOUESTED <br />)BLDG: Pmt. No. %ay gta ❑ MECH: Pmt. No. <br />❑ ELEC: Pmt. No ❑ PLBG: Pmt. No. <br />❑ Temp. Elect. <br />❑ Framing ❑ Gas Piping <br />O Footing <br />J4 Drywall, Nailing ❑ Consultation <br />❑ Foundation <br />❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork <br />❑ Grid ❑ StrucL Slab <br />❑ Wood Stove <br />❑ Rough -In ❑ Final <br />❑ Masonry <br />❑ Service ❑ <br />)KAPPROVAL <br />❑ PARTIAL APPROVAL <br />❑ VIOLATION <br />❑ CORRECTION REOUIRED <br />❑ Corrections listed below MUST BE MADE before wor6 can be approve; <br />❑ Please contact Inspector and arrange for appointment. <br />❑ Was not able to perform Inspection. <br />❑ CALL 259.8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />