Laserfiche WebLink
INSPECTION REPORT <br />Address <br />Contractor_Qu%?? '� <br />Owner�� <br />Date — <br />J APPROVAL J PARTIAL APPROVAL <br />STED <br />J VIOLATION <br />ECTION REQUE <br />J Corrections listed below MU T Be� MADE before work can be approved. <br />J Please contact Inspector and arrange for appointment. <br />J Was not able to perform inspection. <br />111tALL 259.8810 FOR REINSPECTION — 213 hour notice required <br />A 6ERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector r <br />TYPE OF OF INSPECTION REQUESTED <br />emp. Elect. <br />U Framing <br />J Drywall, Nailing <br />J Gas Pipping <br />J.koting , <br />J Foundation <br />J Shear Nailing <br />J Groundwork <br />I GroundConsultationGroundwork <br />J Sfruct. Slab <br />J Ductwork <br />J Wood Stove <br />J Grid <br />U Rough -in <br />J Final <br />Insulation <br />J Masonry <br />�J <br />J Service <br />❑Other <br />[�Q J MECH: Pmt. No. <br />- <br />�HCbG: Pml. No..4—L� <br />J ELEC: Print. No. <br />J PLBG: Print. No. <br />