Laserfiche WebLink
everett INSPECTION REPORT <br />Address 1 Q6 — 7 to Q SF <br />Contractor Joe Irf,�,.,: i � <br />Owner <br />Date 5 /,/A 2 -% — <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. l5 MECH: Pmt. No. U4 e oZ <br />❑ ELEC: Pmt No. <br />❑ PLBG: Pmt. No. <br />❑ Temp. Elect <br />❑ Masonry <br />❑ Framing <br />❑ Consultation <br />❑ Groundwork <br />❑ Footing <br />❑ Foundation <br />❑ Drywall, Nailing <br />❑ Struct. Slab <br />❑ Ductwork <br />❑ Rough- In <br />XFinal <br />❑ Wood Stove <br />❑ Service <br />❑ <br />❑ Gas Piping <br />APPROVAL ❑ PARTIAL APPROVAL <br />❑ CORRECTION REQUIRED <br />❑ Ccrrections listed below M JST BE MADE before work can be approved <br />❑ Please contact inspector a id arrange for appointment. <br />❑ Was not able to perform +,,spection. <br />❑ CALL2r, 45 FOR NEINSPECTION -- 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector <br />