Laserfiche WebLink
everett INSPECTION REPORT <br />Scui <br />Address (%9 1 q12� 01 6f, <br />Contractor U 1L <br />Owner <br />Date _/ (4 <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. )I(MECH: Part. No. <br />❑ ELEC: Pmt. No. ❑ PLBG: Pint. No. <br />❑ Temp. Elect. ❑ Masonry ❑ Consultation <br />❑ Footing ❑ Framing ❑ Groundwork <br />❑ Foundation ❑ Drywall, Nailing ❑ Struct. Slab <br />❑ Ductwork ❑ Rough -In XFinal <br />❑ Wood Stove ❑ Service ❑ <br />rl Gas Piping <br />APPROVAL ❑ PARTIAL APPROVAL <br />❑ CORRECTION REQUIRED <br />17 Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform Inspection. <br />❑ CALL 2660IMb FOR REINSPECTION •- 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. _ ' . e7cvr �,*% <br />7� <br />