Laserfiche WebLink
r. ♦ I, .. .'4�t"i Jf'"♦' n .y( `H.f'♦.''i� ��iu i.:yt. <br />p` CITY OF EVERETT <br />\ C-` DEPARTMENT OF. PUBLIC WORKS <br />UTILITIES DIVISION <br />W.O. No. <br />ii AccL,No.: <br />rt <br />UTILITY WORK ORDER <br />Date: ��' % ^�/ Cr WATER <br />❑ SEWER <br />I ❑ STORM <br />0 <br />I <br />AOSTEQ 2-90 <br />11/SERVICE <br />❑ <br />MAIN <br />❑ <br />PUMP STATION <br />❑ <br />TREATMENT <br />❑ <br />RESERVOIR <br />❑ <br />VALVE <br />❑ <br />MAN HOLE <br />❑ <br />CATCH BASIN <br />Complaint No. <br />❑ MAINTENANCE <br />El OPERATION <br />0/REPAIR <br />❑ CONSTRUCTION <br />p ❑ DITCH <br />Location: �� �� '" Q7 � n-I ^ ,�� <br />W.O. Instructions:, O A-) �L/ C�Cor) / o 0 k .TO=2lh ekr <br />n <br />ESTIMATED <br />ACTHAI <br />Labor (hours) <br />Labor (hours) <br />Material (cost) <br />Material (cost) _ <br />_ <br />Equipment (cost) <br />Equipment (cost) <br />SCHEDULING REQUESTED <br />USE CHARGE ACCOUNT NUMBER BELOW FOR LABOR TIME SLIPS. ITEMIZE <br />LABOR, EQUIPMENT, AND MATERIALS ON REVERSE SIDE. <br />Completion (Date): Cost:$ <br />Charge, Account Number: Charge Cost To (Name): <br />Address: _ <br />Invoice Nc <br />1/65 <br />_Zips <br />nt$ -Date'- <br />-- <br />