Laserfiche WebLink
CITY OF EVERETT <br />Utilities Division <br />MATERIALS USED ON PROJECT <br />W.O. No. 10 <br />M <br />IMM <br />MMIM <br />. <br />MEM. <br />WMIM <br />—�===E <br />wMa <br />�1 <br />�M� <br />� <br />M�M� <br />EM� <br />C <br />.CC. <br />===m <br />C� <br />E� <br />ECCC <br />�� <br />M�MIM <br />M= <br />Z= <br />MCMMI <br />M� <br />CC <br />MCCC <br />Date Work Completed: <br />Signature of Foreman <br />COMMENTS <br />LABOR AND EOUIPMENT ON PROJECT <br />Sub Total Labor Cost $ <br />Total Labor Cost S <br />✓.7 k- F7, 9 <br />Sub Total Material Cost $ <br />Total Material Cost S <br />Sub Total Rental Cost S <br />Total Rental Cost S <br />Total Charges, Materials, Labor and Rentals $ <br />13W J.1'e� �''N(ILtHr'�oF_ /�j119:_6e_cc_ <br />