Laserfiche WebLink
everett INSPECTION REPORT <br />eAddress c:�:'5 16:21J <br />Contractor �AkAil(,�_�,� <br />Owner <br />Date <br />TYP�E�O�F I'NySP/E'�CTION REQUESTED <br />KBLDG: Pmt. No �7(I MECH: Pmt. No. <br />❑ ELEC: Pmt No. C) PLBG: Pmt. No. <br />❑ Temp. Elect. <br />Q Framing ❑ Gas Piping <br />❑ Footing <br />❑ Foundation <br />JMUrywall, Nailing ❑ Consultation <br />❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork <br />❑ Grid ❑ Struct. Slab <br />❑ Wood Stove <br />❑ Rough -in ❑ Final <br />❑ Masonry <br />❑ Service ❑ <br />❑ APPROVAL <br />❑ PARTIAL APPROVAL <br />CJ VIOLATION <br />❑ CORRECTION REQUIRED <br />Li Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />ZQ—Nas not able to perform inspection. <br />ALL 259.8810 FOR REINSPECTION — 24 hour notice required, <br />A ERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />