My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
511 72ND ST SE 2018-01-02 MF Import
>
Address Records
>
72ND ST SE
>
511
>
511 72ND ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 9:07:38 AM
Creation date
4/17/2017 10:10:42 PM
Metadata
Fields
Template:
Address Document
Street Name
72ND ST SE
Street Number
511
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dated <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Applicant <br />Ar) I t <br />Describe Proposed Work <br />Project Address (if known) <br />h01— -- —c_j _ <br />Public work, Permit <br />eldp Dept , <br />Public Work, Fee <br />Total Fee i <br />Lou Appl Fee Paid <br />Balance Due <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines M Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />1. All calls for Inspection Shall be made 24 hrs. In advance - phone 259.81315. <br />2. All work shall be performed In accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications <br />3. Call Location Underground Service 48 fire. before you dig. TOLL FREE NUMBER 1.800-424.5555. <br />No ,emir �'Fga�APEv,� s�Z3�ec <br />G9e�'iDlrE LGCA�io.t% iPE!/asE.O� <br />Approved for Construction Date <br />FINAL INSPECTION Dale <br />Approved as Constructed <br />everetl PUBLIC WORKS DEPARTMENT <br />3200 Ceder Street <br />Everett, WA 982018201 <br />Phone: 259-8815 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />N <br />IIm <br />O <br />M) <br />z <br />O <br />O <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm. <br />less the City of Everett from any and all claims for damages, costs <br />expenses, or causes of action that may arise because of Installation <br />and maintenance of the Improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and t replace public property damaged thereby. <br />Signature of Aftpllcant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.