Laserfiche WebLink
COMPLIANCE <br />REQUIRED <br />INSPECTION <br />APPnovED� IMPORTANT: Please supply Inlonnation In the shaded boxes and check the appropriate <br />circles. Disregard topics that don't describe your building or equipment. DO NOT place <br />checks In the two left columns. <br />�m v <br />O <br />❑ ❑ Q Walls, Including rim joists, Shall be Insulated without compression to R- (Calculations): <br />❑ ❑ za Interlor below grade walls shall be Insulated to,'R- (Calculations) <br />❑ ❑ zs Exterior slab lnsulatlon, if not located on the interior, shall be R- (Calculations).' <br />❑ ❑ ©/aulted ceilings shall be ins:lialed wittiout compression to R- (Calculations) <br />❑ ❑ QSkylight wall Insulation is installed and equivalent to the required wall R-values above. <br />❑ ❑ �e Vapor retarders; shall be Installed toward the warm surface as represented below (502,1.6): <br />Select one option for floors, walls, and appropriate ceilings: <br />Floors: QPlywood W1 exterior glue 0 Poly (a 4 MO) 0 backed baits <br />Walls: Poly plastic (} 4 MII) 0 Face -stapled, backed baits 0 PVA paint <br />Ceilings: 0 Not required where ventilation space averages >12" above insulation. <br />0 Face stapled backed balls 0 Poly plastic (z 4 mil) 0 PVA paint <br />❑ ❑ QHeating system efficiency and sizing requirements shall be met as represented below: <br />❑ ❑ Qxlmum heating system output (150% of design heat load) Is KW 0(5.503.2.2) <br />Brunt 0 <br />❑ ❑ �i Heating system requirements will be met with following system (&503.4.1.1): <br />Mfr.-_Modal # Max. output KW <br />Type <br />WSEC Insulation phase requirements: —� <br />Inspected by: Date - <br />FINAL <br />PHASE <br />❑ OCrawl space Floors shall be insulated without compression, and with support s 24" O.C. to: R- <br />:J ❑ Q Non -vaulted, attic ceilings shall be Insulated without compression to: R- <br />❑ 0 Door systems shall meet: U- <br />See CalDO tions� <br />Door types are (1)_-_____ -_(2) _ (3) ,_�__ <br />Page 7 <br />