My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1515 73RD ST SE 2018-01-02 MF Import
>
Address Records
>
73RD ST SE
>
1515
>
1515 73RD ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 11:31:10 AM
Creation date
4/17/2017 10:13:56 PM
Metadata
Fields
Template:
Address Document
Street Name
73RD ST SE
Street Number
1515
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />06/24/1997 Page 1 <br />------------------------------------------------------------------------------ <br />Date Range :12/03/1900 - 06/10/1997 <br />CM Work Order Range :1001091070001 - PW2548-19- Pattern :7101196751103 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196751103 Title: REPAIR. 1515 73RD ST SE <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WS0785H008 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 06/06/1997 <br />Overall Craft: <br />Issued: 06/02/1997 Issued by: WMW Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Sta`.us: <br />Labor. <br />Craft ID Name <br />Planned Hrs <br />Actual Hrs <br />---------- <br />Cost <br />----------- <br />---•-- ------------------------------------ <br />WS:' LDS LOFLING, DELMAR S. <br />----------- <br />0.00 <br />4.00 <br />87.24 <br />Ws': TDE1 THOMPSON, DWAYNE E. <br />0.00 <br />4.00 <br />76.60 <br />Total <br />Labor Cost: <br />163.84 <br />Materials: <br />ID <br />Description <br />Date # <br />Used <br />Cost <br />---------- <br />------------ <br />ADAP34000347 <br />------------------------------- <br />ADAPTER 3/4" CST X INSTA-TITEQ <br />---------------- <br />06/06/1997 <br />2 <br />15.86 <br />ADAP34000547 <br />ADAPTER 3/4" MIP X INSTA-TITEQ <br />06/06/1997 <br />2 <br />16.76 <br />BOX000065547 <br />BOX METER CONC W/STEEL LID <br />06/06/1997 <br />1 <br />52.32 <br />COUP34004347 <br />COUPLING 3/4" MIP X COP ELL Q <br />06/06/1997 <br />2 <br />7.62 <br />PIPE34060647 <br />PIPE 3/4" POLY I.•P.S. <br />06/06/1997 <br />4 <br />0.92 <br />REDU32100747 <br />REDUCER BELL 3/4" X 1/2"BRASS <br />06/06/1997 <br />1 <br />1.33 <br />SETT34149747 <br />SETTER COP 5/8" X 3/4" (H7") <br />06/06/1997 <br />1 <br />38.60 <br />Total Material <br />Cost: <br />133.41 <br />Vehicles: <br />ID <br />Description <br />Hours Cost <br />---------- <br />------------ <br />V2146 <br />------------------------------ <br />87 CHEV 1 TON W/HYD. UNIT <br />------ <br />4.00 <br />19.20 <br />Total Vehicle Cost: <br />19.20 <br />Total cost for <br />work order 7101196751103: <br />316.45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.