Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System - page 1 <br />10/13/1997 <br />Date Range :01/09/1989 - 10/09/1997 <br />CM Work Order Range :1001091070001 - UT0021-35- Pattern :ern *101196751102 <br />Item Range :<Blank> - WVL36941,05 <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196751182 Title: RENEW .75 INCH 1515 73RD ST SE <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WS0785H008 -- WATER SERVICE <br />Location ID: -- Activity 675 <br />Proqram 710 Function 119 <br />Date. Completed: 09/12/1997 <br />Overall Craft: Issued b WMW Assigned to: <br />Issued: 09/03/1997 y' <br />Travel Time: 0.00 Hr. <br />Out of Service? NO Priority: <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Planned Hrs <br />Actual Hrs <br />Cost <br />Craft <br />ID <br />Name <br />- <br />---------- <br />---------- <br />-------------------------- <br />---- <br />0.00 <br />4.00 <br />87.24 <br />WST <br />LDS <br />LOFLING, DELMAR S. <br />0.00 <br />10.00 <br />191.50 <br />WST <br />TDEI <br />THOMPSON, DWAYNE E. <br />0.00 <br />10.00 <br />157.80 <br />UL <br />WTE <br />WESTVANG, TERRY E. <br />---------- <br />Total <br />Labor Cost: <br />436.54 <br />Materials: <br />ID <br />ADAP34000547 <br />ADAP34000647 <br />COUP36143547 <br />ELLO34101547 <br />ELLO34104247 <br />N/A <br />PIPE34060647 <br />Vehicles: <br />ID <br />V2119 <br />VH0003 <br />VJ0026 <br />Description <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />COUPLING 1" CTN X 3/4" MIP @ <br />ELL 3/4" 45 DEG BRASS <br />ELL 3/4" 90 DEG STREET BRASS <br />TRACE WIRE <br />PIPE 3/4" POLY I.P.S. <br />Description <br />------------------------------ <br />91 CHEV 5 YD <br />94 CAT BACKHOE <br />197 FORD 1 TON SVC TRUCK <br />Date <br /># Used <br />Cost <br />---------- <br />-------- <br />09/12/1997 <br />-------- <br />2 <br />16.76 <br />09/12/1997 <br />1 <br />7.65 <br />09/12/1997 <br />1 <br />4.82 <br />09/12/1997 <br />1 <br />1.34 <br />09/12/1997. <br />2 <br />3.02 <br />09/12/1997 <br />30� <br />09/12/19977 <br />27 <br />5.40 <br />Total Material Cost: „42.29 <br />an <br />8. <br />qn <br />Hours <br />COF L <br />--•-------- <br />--- <br />4 00 <br />43.20 <br />6.00 <br />145.20 <br />10.00 <br />-----59_00 <br />247.40 <br />Total Vehicle Cust <br />Work Description: <br />_ __ ---- <br />----------------- <br />KILLED 1/2" SERVICE 3/4" SERVICE PER AS BUILT <br />