Laserfiche WebLink
gate L-IN-L� Application For TO POSTING ! a pp <br />Dept . _L %13 t1 = = <br />PUBLIC WORKS PERMIT Tpl.�ree <br />Le°. Appi Fee Pad 5 <br />B.bnce Dun <br />Print Or Type Only <br />Address Crty <br />Phone <br />'U-19_L_ <br />Applicant Malting Address city Zip Phone <br />Derr Proposed Work <br />Uj <br />ProleclAddress (if knoon) 222/ — 7.3to S6 <br />Attach four t4) copies of plans for proposed work • Draw to scale and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Exls-mg and proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />1. All calla for Inspection shall be made 24 his. In advance • phone 259.8810. <br />C"n f 2. All work shall be performed in accordance with this permit and current City of Everett Design . Fid Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 his before you dig TOLL FREE NUMBER 1.800.424.5555. <br />IA <br />Approved / Construc I rl a:9 <br />f '�=J!e?/�� <br />FIN INSPECTION Date <br />Approved as Constructed <br />W <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everele tt WA 95201 <br />Phone: 259-8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned ownedapplicanl hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims lot damages costs. <br />expanses. or causes of action that may arise because of Installation <br />and maintenance of the improvement or other fight -of -way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />'§�fn'ature of AVplicani Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />RE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />