Laserfiche WebLink
CITY OF EVEIZETT <br />BU/LDINO 01Y15I0N <br />32470 CEDAR 5T. ENERETT, WA 98201 (Z06) 259-881V <br />About this form: This form Isn't as Involved as it looks, because you only use portions of it for a particular <br />dwelling project. Instead of spending time searching through the WSEC, this form will help organize and <br />condense the requirements that apply to your project. It Is also an excellent font for learning the residential <br />WSEC requirements. <br />Requirements are grouped by foundation, framing, Insulation, and final inspection phases. This not only <br />lets you know what you need to do but also when the Inspector will be checkinj for particular <br />requirements. Use the form to choose compliance options that best suit the economics ano design of your <br />project. <br />A designated department energy specialist can help you with your questions. This form will help you <br />comply with the WSEC as quickly and painlessly as possible. <br />Rosponsiblllty for Information: Although staff members will help you with general questions about <br />completing this .orm, it Is ultimately your responsibility to provide detailed information about heating <br />systems, glazing, Insulation, and other building specifications. Be sure to _A prior approval from the <br />Department I! you later wish to make changes in your project. For more requirement detail, refer to the <br />WaShirl9tor, State Energy Code, 1991 Edition. <br />3� Page 1, Cnmptlance Options: Select one compliance option at the top of the table. <br />Paqes 2 through 6, Dilhe_shadpcl box areas_ornly: Provide im "mation and check circles that apply to <br />your specific project. Do not placamarks in the two leit side columns labeled "COMPLIANCE REQUIRED" <br />=j and "INSPECTION APPROVED" or in boxes located in non -shaded areas (These are for department use). <br />Since this form will be evaluated for completeness and accuracy, you can avoid unecessary permit delays <br />by carefully providing all required Information. You mdy disregard items that don't address your particular <br />building or equipment. <br />Compliance responsibility: This form will ultimately be used for all WSEC field inspections. When it Is <br />returned with your permit, relevant boxes under the "COMPLIANCE REQUIRED" column will have been <br />checked by the Building Departmen+ This denotes which WSEC requirements apply to your project. The <br />Inspector will inspect your dwelling against these checked items and, when deemed acceptable, place a <br />second check in the "INSPECTION APPROVED" column. <br />All residential Occupancies <br />OTHER heat source (Gas, oil, propane, wood, heat pumps) <br />