Laserfiche WebLink
June 30, 1980 <br />Harvey F. Nurmi <br />9608 60th St N.E. <br />Everett, WA 98205 <br />RE: 1929 - 74th St S.E. <br />Subject: Information needed to process Right -of -Way <br />Use Permit # 80/187 <br />Dear Applicant: <br />To complete the review of your application for a Right -of -Way Use Permit, it <br />has been determined that the items marked below are required to expedite the <br />processing of your application: <br />O Signature required on application, enclosed. <br />O Additional information on project as noted below. <br />O copies of drawings or site plans <br />O Required improvements at this time include: <br />I1. pl <br />everett <br />utr N.LL. t!t•sl59 <br />tvtntrt. wmugotoe <br />..201 <br />O Revised drawing, showing required improvement. <br />• Proof of ownership declaration enclosed. <br />Q Authorized deed for feet of right-of-way, fronting the development, <br />be deeded to the City of Everett, deed form enclosed. <br />Local Improvement District notarized Covenant Power -of -Attorney, enclosed. <br />O Performance bond, cash deposit, or equivalent guarantee for 120% of the <br />estimated improvement cost or 120% of an acceptable, written bid by a <br />licensed and bonded contractor. <br />City Ordinance 11555-78 is enclosed for your reference. Please mail or hand -carry this <br />information to the City of Everett Engineering Department, 2nd Floor, 3200 Cedar St. <br />If we can provide additional information, or if you have any questions regarding the <br />above requirements, please contact Kathy Green at 259-881 1. <br />Sincerely, <br />HUGH WARREN, P.E. <br />Director of <br />Public Works <br />By: Kathy Green <br />Public Service Aide <br />KG:jcl <br />Enclosure <br />cc: Larry Callahan, Supervisor <br />Building Department <br />