My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2105 74TH ST SE 2018-01-02 MF Import
>
Address Records
>
74TH ST SE
>
2105
>
2105 74TH ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2021 10:28:19 AM
Creation date
4/17/2017 10:57:29 PM
Metadata
Fields
Template:
Address Document
Street Name
74TH ST SE
Street Number
2105
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: 10/21/2013 <br />Public Works Permit #: PW1310-009 <br />City of Everett Public Works Department <br />(trig ra.r, / 3200 Cedar Street Buildinq Permit #; C1309-008 <br />Everett, WA 98201 Planninq Reference #: <br />(425) 257-8810 <br />Public Works Fee $: $ 65.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />DYNASTY HOLDINGS LLC <br />PO BOX 716 <br />EVERETT WA 98201 <br />PHONE: 4254221688 PHONE: <br />TAX PARCEL ID # 00545204102100 SITE ADDRESS: 2105 74TH ST SE <br />DESCRIPTION OF PROPOSED WORK <br />PUBLIC WORKS FOR NEW SFR <br />'REMOVE SHED ON PROPERTY LINE PER SURVEY' <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2 All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3 Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4 Connect side sewer per City Standard #'s 601, 602, 604 ^ 1-) <br />5. The contractor must meet with the Public Works Inspector to discuss PaWrittrarl drAmIrge-routingphor M — 1 <br />beginning the project Call Remy -Alvan at 425-339-?4e9.7 1/091 411 e2+p� A PM Z z <br />6 All excavated material from foundation, sidewalk and driveways shall bo hsMd VA Si� F <br />No wasting of material is allowed on this building lot <br />7 No dirt, mud, rocks or debris to be tracked onto roadway <br />8 Pave driveway from the front property line out to the street paving <br />9 Mark storm pipe and maintain safe distance dupm ectnslruction. A F` <br />�T9 <br />TO POSTING ��»" La <br />✓ e <br />Approved for Construction Date <br />PO*rINSPECTION Date <br />Approved as Constructed 3 //—/ <br />J <br />��CO'Cb�tC��l� pt+JGgi�00ta r' <br />4 LdS VCa�GS600SSGTm ['J <br />I-+ <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of Installation and maintenance of the improvement <br />or other right-of-way use herelo applied for and further agrees <br />1 ame upo ce Irom the City and to replace <br />Wpublicrty aged herebyApplicant Dale , <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 160 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />P II <br />
The URL can be used to link to this page
Your browser does not support the video tag.